— Quantum loophole fiber
— Electrical energy capacity available
— Natural gas adjacent to site
— Water intake station on the Potomac
— Rail line
— Two pepco stations
— Redundant transmission lines throughout
— 520 MW BESS system to be constructed
— 30 MW of solar to be constructed onsite
— Montgomery County, MD
— 14 miles from Sterling, VA
— 250 contiguous acres